RV Pad Installation Kings provides RV pad installation, concrete and gravel RV parking pads, and RV hookups in the Plantation, FL area for both residential and commercial properties, from a single camper pad beside the house to pads for RV parks. Contact us now for a free estimate.
RV pad installation in Plantation, FL costs anywhere from $2,450 to $9,800 on average for a 12 by 40 foot pad without hookups, with compacted gravel at the low end and reinforced concrete at the high end. The price depends on the pad size, the material and slab thickness, grading and soil, truck access, and whether electric, water, or sewer hookups are added.
Yes, we build RV pads at houses, rural properties, storage lots, RV parks, and campgrounds. Tell us the property type and the size of the RV, trailer, or boat that will park there.
Yes, we cover the Plantation, FL area. Send us the property address and we'll confirm.
Yes, we cover Plantation Acres, which the city designates a Special Public Interest Rural District, along with the rest of Plantation. Larger lots there may leave room for a longer pad and a wider turn in from the road. Because the district has its own designation, we ask you to check its rules on RV parking before we stake the pad.
Most pads are 12 to 14 feet wide and 40 to 60 feet long. We size it to your rig with slide-outs open, plus about 3 to 5 feet on each side so you can walk around it and open doors.
Gravel costs less, drains well, and we can build it faster. Concrete stays flat and clean, holds a heavy motorhome on jacks without rutting, and often costs two to three times as much.
We can usually schedule a gravel pad within a few weeks. Concrete pads and pads that need a permit, a curb cut, or hookups usually take longer to line up.
We usually finish a gravel pad in one to two days once the stone is delivered. A concrete pad typically takes us two to four days from digging to cleanup, plus curing time, and hookups can stretch the job to about a week.
We need the address, the RV's length and width with slide-outs open, the material you want, and photos of the spot and the path from the street. Mention any hookups, gates, slopes, or trees.
No, as long as we can reach the spot and you've approved the layout. It helps to be there when we stake the pad so you can check the position and how the RV will pull in.
Yes, we confirm the price before starting. If we hit soft ground, rock, buried debris, or old concrete once we dig, we talk to you before doing any extra work.
Yes, in many places, especially for a concrete slab, a new curb cut, or any electric, water, or sewer hookup. Some towns treat a gravel pad like a driveway and need no permit. Your local building office decides, and we can tell you what's usually required.
Yes, many HOAs ban or limit RV parking on driveways and side yards, and their rules can be stricter than the city's. Check your covenants and get written approval before we start.
Yes, in many cities, but rules on setbacks, paved or gravel surfaces, and how much of the lot can be covered vary. Your zoning office has the rules, so check them before we lay out the pad.
We usually pour RV pads 6 inches thick with reinforcement. We go to 8 inches for the heaviest motorhomes or soft ground.
Yes, we reinforce RV slabs, usually with #4 rebar on about an 18 inch grid or with welded wire mesh, and pour around 4,000 PSI concrete over about 6 inches of compacted crushed stone.
We usually build 4 to 8 inches of compacted crushed stone in layers, deeper on soft or clay ground. Loose pea gravel ruts under RV tires, so we use angular stone that locks together.
Yes, asphalt usually costs between gravel and concrete and matches an asphalt driveway. It can soften in hot weather under jacks and stabilizers, so we put pads under the jack feet or suggest concrete for heavy motorhomes.
Yes, we can lay pavers rated for vehicles over a deep compacted base. They usually cost more than plain concrete and the joints need some upkeep, but single pavers can be replaced.
Yes, we have a licensed electrician run a dedicated circuit to a 30 or 50 amp RV outlet at the pad. It usually costs $800 to $2,000 depending on the amperage and the distance from your panel, and it needs a permit in most places.
The one that matches the plug on your RV's power cord. Smaller trailers usually have a 30 amp plug and larger motorhomes and fifth wheels a 50 amp plug, so tell us which one you have.
Yes, we can run a water line to the pad, buried below the frost line, and it can end in a freeze-proof yard hydrant. Tell us where your water line or outdoor spigot is.
Yes, we can run a line from the pad to your sewer cleanout or a new connection, usually with a permit. If the sewer line is far from the pad, a macerator pump can be used instead.
Yes, in many cases, through a cleanout on the line to the tank, as long as local rules allow it and the system can handle the extra waste. Tell us whether you're on septic or city sewer.
Yes, the electrical conduit, water line, and sewer pipe should be placed before the pour so nobody has to cut the slab later. Tell us now if you might want hookups in the future.
Yes, if there's room for the RV to turn in. Side yards often have fences, narrow gates, AC units, and utility easements, so send us photos and the width between the house and the property line.
Yes, we often widen a driveway for an RV pad and match its surface and grade.
Yes, but work in the street right of way usually needs a permit from the city or county, and they set the width and slope. We'll tell you what your local office typically asks for.
Yes, we cut and fill the ground so the pad sits close to level, with a slight slope to drain water. Steeper lots may need a retaining edge, so send us photos taken from the side.
We grade the base and the finished surface with a slight slope away from the house, and add a drain or swale where water collects. Tell us where water sits after heavy rain.
Yes, we dig out the soft material, lay geotextile fabric, and add a thicker stone base. Concrete on poor soil may also need a thicker slab.
No, not where branches or wires would hang low over the RV's roof, AC unit, or antenna. Tell us about anything overhead near the spot so we can shift the pad or plan trimming.
Yes, we can size the pad for a cover and leave room for its posts or footings. Send us the cover's dimensions and anchoring specs before we pour.
Yes, we build multiple pads with site drainage, back-in or pull-through layouts, and hookup trenching. Campground sites are often at least 20 by 50 feet, so send us the site plan and the number of spots.
No, we request the 811 locate before digging. It marks public gas, electric, water, and communication lines, but not private lines like sprinklers or landscape lighting, so point those out to us.
Yes, move the RV and anything on the spot, and clear a path for trucks.
Yes, in most cases, as long as the ground isn't frozen. Cold slows curing, so we may use blankets or a warmer mix, and gravel pads can usually be built in any dry spell.
We usually ask you to wait at least 7 days, and longer for a heavy motorhome. Concrete keeps gaining strength for about a month.
Yes, for many owners who are allowed to park at home. Compare our price with a few years of storage fees, and you also get to load, clean, and charge the RV without a drive.
Yes, a gravel pad is possible if you can rent a skid steer and plate compactor and spread several truckloads of stone. We'd steer you away from pouring a concrete RV slab yourself, since it takes a crew, forms, and truck or pump access.
Yes, often right over the existing stone once we regrade and compact it.
Yes, we can repair minor cracks and low spots in concrete or regrade and top up a rutted gravel pad. A slab that has broken up or sunk badly usually has to be replaced.